← Back to all services
Post-Construction Cleanup

From build-out to move-in ready.

Construction-grade cleaning for new builds, tenant improvements, and renovations — removing every trace of drywall dust, adhesive haze, and construction debris.

Get a Free Quote →
What's Included
  • Drywall dust removal from all surfaces
  • Construction debris sweep & removal
  • Window glass & frame scrubbing
  • Adhesive, paint splatter & label removal
  • HVAC vent cover cleaning
  • Final polish — floors, fixtures & surfaces
Why It Matters

Professional results, every time.

Our trained crews use the right equipment and products for your specific facility — delivering consistent, verifiable results.

Phased Cleaning Capability

We handle rough clean, final clean, and touch-up phases — coordinating with your GC's schedule to avoid project delays.

Full Debris Removal

Cardboard, packaging, scrap material, and construction waste are bagged and removed from the site in a single pass.

HEPA-Filtered Equipment

Drywall and concrete dust requires true HEPA filtration — we use commercial vacuums that capture fine particulate safely.

Glass & Surface Detailing

Adhesive labels, construction film, and paint overspray on glass, metal, and cabinetry are carefully removed without scratching.

Punch-List Ready

Our final walk-through matches your GC's punch-list so you hand off a space that passes inspection the first time.

Deadline-Driven Scheduling

We work around construction timelines — including nights and weekends — to hit your handover date.

How It Works

Simple, transparent process.

01

Site Walkthrough

We review the scope of construction, materials used, and your GC's handover timeline.

02

Phased Plan

A cleaning schedule is aligned with construction phases — rough, final, and touch-up if needed.

03

Crew Mobilization

A dedicated post-construction crew with appropriate equipment and HEPA vacuums arrives on schedule.

04

Sign-Off Inspection

A supervisor conducts a final walk-through against your punch-list before the space is handed over.

Common Questions

Frequently asked questions.

What's the difference between rough clean and final clean?

Rough clean happens during or immediately after construction — removing large debris, scraping adhesives, and doing initial surface wipes. Final clean is a thorough detail pass once all trades are done, delivering a space ready for furniture and occupancy.

How long does post-construction cleaning take?

It depends on square footage and construction type. A typical 5,000 sq ft tenant improvement takes 1–2 days for final clean. We'll provide a time estimate after reviewing your site.

Can you coordinate with our general contractor?

Yes. We're experienced working on active construction sites and can coordinate directly with your GC for access, phasing, and sign-off.

Do you handle hazardous materials like asbestos or mold?

No — remediation of hazardous materials requires certified abatement contractors. We handle standard construction debris and finishes only.

What if we need cleaning in multiple phases of the project?

We offer phased cleaning packages covering rough, detailed, and pre-occupancy passes — priced together for project continuity.

Ready for a cleaner facility?

Schedule your free, no-pressure walkthrough and get a tailored flat-rate quote within one business day.

Request Free Quote → (832) 983-6806
Explore More

Other services we offer.